中国标准在线服务网

微信公众号随时随地查标准

QQ交流1群(已满)

QQ群标准在线咨询2

QQ交流2群

购买标准后,可去我的标准下载或阅读

ASME B30.16-1998 Overhead Hoists (Underhung) 发布日期 :  实施日期 : 

定价: 60 加购物车

在线阅读 收 藏
ASME B30.20-2010 Below-the-Hook Lifting Devices 发布日期 :  实施日期 : 

定价: 70 加购物车

在线阅读 收 藏
ASME B30.20-2025 Below-the-Hook Lifting Devices 发布日期 :  实施日期 : 

Volume B30.20 includes provisions that apply to the marking, construction, installation, inspection, testing, maintenance, and operation of below-the-hook lifting devices, other than components addressed by other ASME B30 volumes or other standards, used for attaching loads to a hoist. The requirements in this Volume also apply to clamps used for positioning and anchoring.

定价: 95 加购物车

在线阅读 收 藏
ASME B30.24-2008 Container Cranes 发布日期 :  实施日期 : 

定价: 40 加购物车

在线阅读 收 藏
ASME B30.24-2013 Container Cranes 发布日期 :  实施日期 : 

定价: 42 加购物车

在线阅读 收 藏
ASME B30.27-2025 Material Placement Systems 发布日期 :  实施日期 : 

B30.27 applies to the construction, installation, operation, inspection, testing, and maintenance of trailer and truck-mounted material placement systems. Included in this are mechanical and hydraulic pea gravel systems, mobile telescoping boom conveyors, separate placing booms, and material placement accessories. Truck-mounted material placement systems can be either with or without an integral placing boom.

定价: 70 加购物车

在线阅读 收 藏
ASME B30.3-2004 Construction Tower Cranes 发布日期 :  实施日期 : 

Within the general scope as defined in Section I, B30.3 applies to construction tower cranes, powered by electric motors or internal combustion engines, and any variations thereof which retain the same fundamental characteristics. The scope includes cranes of the above type that adjust operating radius by means of a boom luffing mechanism, or by means of a trolley traversing a horizontal boom, or by means of a combination of the two. Construction tower cranes may be mounted on fixed or traveling bases. Additional mounting means may include arrangements that permit the crane to climb in the structure being built, or that permit increasing the tower height as the structure rises and utilizing braces attached to the host structure as needed. The requirements of this volume are applicable only to cranes when used in lifting work. Permanently mounted tower cranes (refer to ASME B30.4) and mobile crane tower attachments (refer to ASME B30.5) are not within the scope of this volume.

定价: 55 加购物车

在线阅读 收 藏
ASME B30.5-2000 Mobile and Locomotive Cranes 发布日期 :  实施日期 : 

定价: 90 加购物车

在线阅读 收 藏

B30.6 applies to the construction, installation, operation, inspection, testing, and maintenance of guy, stiffleg, basket, breast, gin pole, Chicago boom, shearleg, and A-frame derricks. These derricks, powered by winches through systems of wire rope reeving, are used for lifting, lowering, and horizontal movement of freely suspended unguided loads. Derricks are usually stationary mounted and may be temporarily or permanently installed. The provisions included in this volume also apply to any variations of these types of derricks with the same fundamental characteristics, except those specified for floating derricks in ASME B30.8, Floating Cranes and Floating Derricks.

定价: 65 加购物车

在线阅读 收 藏

定价: 60 加购物车

在线阅读 收 藏
ASME B31.1-2001 Power Piping 发布日期 :  实施日期 : 

定价: 230 加购物车

在线阅读 收 藏

定价: 126 加购物车

在线阅读 收 藏
ASME B31.3-1984 Process Piping 发布日期 :  实施日期 : 

定价: 0 加购物车

在线阅读 收 藏
ASME B31.3-2012 Process Piping 发布日期 :  实施日期 : 

定价: 462 加购物车

在线阅读 收 藏
2175 条记录,每页 15 条,当前第 18 / 145 页 第一页 | 上一页 | 下一页 | 最末页  |     转到第   页