This standard specifies the methods, technical requirements and acceptance criteria of primary loop hydraulic tests in a pressurized water reactor (PWR) nuclear power plant, to ensure integrity of the pressure boundary in primary loop, and that equipment manufacturing quality and installation quality satisfy the requirements for long-term stable operation of the unit as well as nuclear safety regulations.
This standard is applicable to the primary loop hydraulic tests of initial start-up commissioning phase of in a PWR nuclear power plant.
定价: 192元 / 折扣价: 164 元 加购物车
本文件规定了核电厂:a)〓安全级电力系统的主要设计准则和设计措施,这些准则和措施能使安全级电力系统在适用的设计基准事件引起的工况下满足其功能要求;b)〓安全级电力系统的试验和监测要求;c)〓多机组核电厂共用的安全级电力系统的准则;d)〓安全级电力系统的文档要求。本文件适用于单机组和多机组核电厂下列系统和设备的安全级部分:--交流电力系统;--直流电力系统;--仪表和控制(I&C)用电力系统。本文件不适用于优先电源、机组的发电机及其母线、发电机断路器、主(即升压)变压器、辅助(即厂用)变压器、启动变压器、至核电厂开关站的连接线、开关站、输电线和输电网络(见图2和图3)。
定价: 49元 / 折扣价: 42 元 加购物车