This code is applicable to the geotechnical engineering, survey and engineering hydrological exploration of 220 kV and 110 kV overhead transmission lines that are newly built and modified.
This part is applicable to surveying nuclear power plants and their ancillary facilities at design and construction stage.It may also be used as a reference for surveying during operation management stage.
1.0.2 This code is applicable to geotechnical engineering investigation for various types of ash yards of coal-fired power plants, such as valley ash yard, plain ash yard, and shoal ash yard.
This part is applicable to investigation and evaluation of geology and earthquakes during the stages of pre-feasibility study and feasibility study for siting of nuclear power plants.