【国外标准】 Standard Guide for Developing a Cost-Effective Risk Mitigation Plan for New and Existing Constructed Facilities
本网站 发布时间:
2024-02-28
开通会员免费在线看70000余条国内标准,赠送文本下载次数,单本最低仅合13.3元!还可享标准出版进度查询、定制跟踪推送、标准查新等超多特权!  
查看详情>>
标准简介
适用范围:
5.1 Standard practices for measuring the economic performance of investments in buildings and building systems have been published by ASTM. A computer program that produces economic measures consistent with these practices is available.5 The computer program is described in Appendix X3. Discount Factor Tables has been published by ASTM to facilitate computing measures of economic performance for most of the practices.5.2 Investments in long-lived projects, such as the erection of new constructed facilities or additions and alterations to existing constructed facilities, are characterized by uncertainties regarding project life, operation and maintenance costs, revenues, and other factors that affect project economics. Since future values of these variable factors are generally unknown, it is difficult to make reliable economic evaluations.5.3 The traditional approach to uncertainty in project investment analysis is to apply economic methods of project evaluation to best-guess estimates of project input variables, as if they were certain estimates, and then to present results in a single-value, deterministic fashion. When projects are evaluated without regard to uncertainty of inputs to the analysis, decision-makers may have insufficient information to measure and evaluate the financial risk of investing in a project having a different outcome from what is expected.5.4 To make reliable economic evaluations, treatment of uncertainty and risk is particularly important for projects affected by natural and man-made hazards that occur infrequently, but have significant consequences.5.5 Following this guide when performing an economic evaluation assures the user that relevant economic information, including information regarding uncertain input variables, is considered for projects affected by natural and man-made hazards.5.6 Use this guide in the project initiation and planning phases of the project delivery process. Consideration of alternative combinations of risk mitigation strategies early in the project delivery process allows both greater flexibility in addressing specific hazards and lower costs associated with their implementation.5.7 Use this guide for economic evaluations based on Practices E917 (life-cycle costs), E964 (benefit-to-cost and savings-to-investment ratios), E1057 (internal rate of return and adjusted internal rate of return), E1074 (net benefits and net savings), E1121 (payback), E1699 (value engineering), and E1765 (analytical hierarchy process for multi-attribute decision analysis).5.8 Use this guide in conjunction with Guide E2204 to summarize the results of economic evaluations involving natural and man-made hazards.1.1 This guide describes a generic framework for developing a cost-effective risk mitigation plan for new and existing constructed facilities—buildings, industrial facilities, and other critical infrastructure. This guide provides owners and managers of constructed facilities, architects, engineers, constructors, other providers of professional services for constructed facilities, and researchers an approach for formulating and evaluating combinations of risk mitigation strategies.1.2 This guide insures that the combinations of mitigation strategies are formulated so that they can be rigorously analyzed with economic tools. Economic tools include evaluation methods, standards that support and guide the application of those methods, and software for implementing the evaluation methods.1.3 The generic framework described in this guide helps decision-makers assess the likelihood that their facility and its contents will be damaged from natural and man-made hazards; identify engineering, management, and financial strategies for abating the risk of damages; and use standardized economic evaluation methods to select the most cost-effective combination of risk mitigation strategies to protect their facility.1.4 The purpose of the risk mitigation plan is to provide the most cost-effective reduction in personal injuries, financial losses, and damages to new and existing constructed facilities. Thus, the risk mitigation plan incorporates perspectives from multiple stakeholders—owners and managers, occupants and users, and other affected parties—in addressing natural and man-made hazards.1.5 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use.1.6 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.
标准号:
ASTM E2506-15(2020)e1
标准名称:
Standard Guide for Developing a Cost-Effective Risk Mitigation Plan for New and Existing Constructed Facilities
英文名称:
Standard Guide for Developing a Cost-Effective Risk Mitigation Plan for New and Existing Constructed Facilities标准状态:
Active-
发布日期:
-
实施日期:
出版语种:
- 推荐标准
- 国家标准计划
- 24/30491443 DC standard
- 24/30489392 DC BS EN IEC 62358 Ferrite cores. Standard inductance factor for gapped cores and its tolerance
- BS ISO 19848:2024 - TC Tracked Changes. Ships and marine technology. Standard data for shipboard machinery and equipment
- BS ISO 19848:2024 Ships and marine technology. Standard data for shipboard machinery and equipment
- BS IEC 61360-7:2024 Standard data element types with associated classification scheme
- 24/30487130 DC BS EN 50566:2017/A2:2024 Product standard to demonstrate the compliance of wireless communication
- 24/30486472 DC - Product standard
- KS M ISO 4259-4 석유 및 관련 제품 — 측정 방법과 결과의 정밀도 — 제4부: 개별 실험실에서 표준 시험방법의 실행에 대한 ‘통계적 관리’ 상태를 확인하기 위한 통계적 관리도의 사용
- KS C IEC 61340-4-7 정전기학 — 제4-7부: 구체적 적용 분야에 대한 표준 시험방법 — 이온화
- KS C IEC 61340-4-6 정전기학 — 제4-6부: 구체적 적용 분야에 대한 표준 시험방법 — 손목접지대
- KS C IEC 61340-4-8 정전기학 — 제4-8부: 구체적 적용 분야에 대한 표준 시험방법 — ESD 차폐성 — 봉투
- 24/30485973 DC standard
- BS EN 14662-1:2023 - TC Tracked Changes. Ambient air quality. Standard method for measurement of benzene concentrations
- KS C IEC 61837-2 주파수 제어 및 선택을 위한 표면 실장형 압전 장치 — 표준 아웃라인 및 단자 리드 연결 — 제2부: 세라믹 함체
- BS EN IEC 61753-081-02:2023 Fibre optic interconnecting devices and passive components. Performance standard