【国外标准】 Standard Practice for Specification and Evaluation of Pre-Construction Laboratory Mockups of Exterior Wall Systems
本网站 发布时间:
2024-02-28
开通会员免费在线看70000余条国内标准,赠送文本下载次数,单本最低仅合13.3元!还可享标准出版进度查询、定制跟踪推送、标准查新等超多特权!  
查看详情>>
标准简介
适用范围:
4.1 Exterior wall systems require time to design, fabricate, construct and test. Mockups are generally a full-size representative portion of the proposed exterior wall system built to study proposed construction details, test for performance, and in some cases judge appearance of the exterior wall system. The project schedule shall allow time to design, construct, and test the pre-construction mockup and to implement any design changes, fabrication changes, or modifications of planned construction procedures, before construction of the exterior wall system commences.4.2 Performance testing of pre-construction mockups verifies compliance with specified standards and design criteria. Performance tests in separate ASTM or other industry standards, are intended to represent the effects of environmental conditions, such as wind, rain, and temperature extremes. The tests provide a measure of the performance of the proposed exterior wall system under specific and controlled conditions. The specified design and specification of the pre-construction mockup must be appropriate for the performance test requirements. Separate tests may be required for individual mockup materials or components.4.3 Pre-construction mockup specimens require input from Specifier, Builder, and Test Agency. Coordination of their efforts facilitates this process. Documentation should convey the results of preconstruction mockups from one party to others at appropriate stages in the process.4.4 The referenced standards provided in this practice identify the historical standards typically utilized in pre-construction performance testing. This practice allows for the development and use of other project specific test procedures for various components that encompass exterior wall systems.1.1 This standard practice covers procedures and documentation to assist in the specification and evaluation of pre-construction laboratory mockups of exterior wall systems.1.2 This standard practice addresses design and construction of the mockup, observation during mockup construction and testing, evaluation of the mockup test results, and documentation of the mockup and testing process. Coordination is required between the parties involved in the design, construction, and testing of the mockup to facilitate this process. Documentation should convey the results of pre-construction mockups from one party to others at appropriate stages in the process.1.3 This standard practice recommends the selection and order of individual tests performed on the mockup in the absence of a specific test order.1.4 This standard practice recommends a protocol for exchange of information between participants in the pre-construction mockup process.1.5 Responsibility for specific activities is recommended by this practice. This practice is intended to provide a default structure in the absence of the assignment of specific responsibilities by the specifying authority.1.6 The values stated in inch-pound units are to be regarded as standard. The values given in parentheses are mathematical conversions to SI units that are provided for information only and are not considered standard.1.7 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.
标准号:
ASTM E2099-23
标准名称:
Standard Practice for Specification and Evaluation of Pre-Construction Laboratory Mockups of Exterior Wall Systems
英文名称:
Standard Practice for Specification and Evaluation of Pre-Construction Laboratory Mockups of Exterior Wall Systems标准状态:
Active-
发布日期:
-
实施日期:
出版语种:
- 其它标准
- 上一篇: ASTM E2098/E2098M-13(2023) Standard Test Method for Determining Tensile Breaking Strength of Glass Fiber Reinforcing Mesh for Use in Class PB Exterior Insulation and Finish Systems (EIFS), after Exposure to a Sodium Hydroxide Solution
- 下一篇: ASTM E2100-04(2015) Standard Practice for Calculating the International Runway Friction Index (Withdrawn 2019)
- 推荐标准
- 国家标准计划
- 24/30491443 DC standard
- 24/30489392 DC BS EN IEC 62358 Ferrite cores. Standard inductance factor for gapped cores and its tolerance
- BS ISO 19848:2024 - TC Tracked Changes. Ships and marine technology. Standard data for shipboard machinery and equipment
- BS ISO 19848:2024 Ships and marine technology. Standard data for shipboard machinery and equipment
- 24/30487130 DC BS EN 50566:2017/A2:2024 Product standard to demonstrate the compliance of wireless communication
- BS IEC 61360-7:2024 Standard data element types with associated classification scheme
- 24/30486472 DC - Product standard
- KS M ISO 4259-4 석유 및 관련 제품 — 측정 방법과 결과의 정밀도 — 제4부: 개별 실험실에서 표준 시험방법의 실행에 대한 ‘통계적 관리’ 상태를 확인하기 위한 통계적 관리도의 사용
- KS C IEC 61340-4-7 정전기학 — 제4-7부: 구체적 적용 분야에 대한 표준 시험방법 — 이온화
- KS C IEC 61340-4-8 정전기학 — 제4-8부: 구체적 적용 분야에 대한 표준 시험방법 — ESD 차폐성 — 봉투
- KS C IEC 61340-4-6 정전기학 — 제4-6부: 구체적 적용 분야에 대한 표준 시험방법 — 손목접지대
- 24/30485973 DC standard
- BS EN 14662-1:2023 - TC Tracked Changes. Ambient air quality. Standard method for measurement of benzene concentrations
- KS C IEC 61837-2 주파수 제어 및 선택을 위한 표면 실장형 압전 장치 — 표준 아웃라인 및 단자 리드 연결 — 제2부: 세라믹 함체
- 24/30485462 DC BS EN IEC 61753-1 Fibre optic interconnecting devices and passive components - Performance standard