标准详细信息 去购物车结算

【国外标准】 Standard Guide for Designing Cost-Effective Sampling and Measurement Plans by Use of Estimated Uncertainty and Its Components in Waste Management Decision-Making (Withdrawn 2015)

本网站 发布时间: 2024-02-28
  • ASTM D6842-02(2007)
  • Withdrawn, No replacement
  • 定价: 0元 / 折扣价: 0
  • 在线阅读
开通会员免费在线看70000余条国内标准,赠送文本下载次数,单本最低仅合13.3元!还可享标准出版进度查询、定制跟踪推送、标准查新等超多特权!   查看详情>>
标准简介标准简介

适用范围:

This guide will evaluate sample data that contain a high level of uncertainty for decision-making purposes and, where it is feasible, design a statistical study to estimate and reduce the sources of uncertainty. Oftentimes, historical data may be available and adequate for this purpose and no new study is needed.3.1.1 This approach will help the stakeholders better understand where the greatest sources of uncertainty are in the sampling and analysis process. Resources can be directed to where they can most reduce the overall uncertainty.3.1.2 Sampling and analysis design under this approach can often be cost-efficient because (a) the reduction in uncertainty can be done by statistical means alone and (b) the reduction can be translated into a lower number of analyses.This guide is limited to the situation where a decision is based on the mean of a population. It will only include discussions of a balanced design for the collection and analysis of sample data in order to estimate the sources of uncertainty. References to unbalanced designs are provided where appropriate.1.1 Waste management decisions generally involve uncertainty because of the fact that decisions are based on the use of sample data. When uncertainty can be reduced or controlled, a better decision can be achieved. One way to reduce or control uncertainty is through the estimation and control of the components contributing to the overall uncertainty (or variance). Control of the sizes of these variance components is an optimization process. The optimizations results can be used to either improve an existing sampling and analysis plan (if it should be found to be inadequate for decision-making purposes) or to optimize a new plan by directing resources to where the overall variance can be reduced the most.1.2 Estimation of the variance components from the total variance starts with the sampling and measurement process. The process involves two different kinds of uncertainties: random and systematic. The former is associated with imprecision of the data, while the latter is associated with bias of the data. This guide will discuss only sources of uncertainty of a random nature.1.3 There may be many sources of uncertainty in waste management decisions. However, this guide does not intend to address the issue of how these sources are identified. It is the responsibility of the stakeholders and their technical staff to analyze the sampling and measurement processes in order to identify the potentially significant sources of uncertainty. After identifying these sources, this guide will provide guidance on how to collect and analyze data to obtain an estimate of the total uncertainty and its components.

基本信息

  • 标准号:

    ASTM D6842-02(2007)

  • 标准名称:

    Standard Guide for Designing Cost-Effective Sampling and Measurement Plans by Use of Estimated Uncertainty and Its Components in Waste Management Decision-Making (Withdrawn 2015)

  • 英文名称:

    Standard Guide for Designing Cost-Effective Sampling and Measurement Plans by Use of Estimated Uncertainty and Its Components in Waste Management Decision-Making (Withdrawn 2015)
  • 标准状态:

    Withdrawn, No replacement
  • 发布日期:

  • 实施日期:

  • 出版语种:

标准分类号

  • 标准ICS号:

  • 中标分类号:

关联标准

  • 替代以下标准:

  • 被以下标准替代:

  • 引用标准:

  • 采用标准:

出版信息

  • 页数:

    0 页
  • 字数:

  • 开本:

其他信息

  • 起草人:

  • 起草单位:

  • 归口单位:

  • 提出部门:

  • 发布部门:

  • 推荐标准
  • 国家标准计划