微信公众号随时随地查标准

QQ交流1群(已满)

QQ群标准在线咨询2

QQ交流2群

购买标准后,可去我的标准下载或阅读

1.1 This guide recommends minimum performance requirements for enhanced access to public safety services using the North American standard emergency telephone number, 9-1-1.1.2 This guide provides assistance to states, counties, and local jurisdictions in the development of 9-1-1 enhanced systems.1.3 This guide makes recommendations for planning and organizational needs in the development of 9-1-1 enhanced systems.1.4 This guide does not address access to public safety response services through means other than use of the 9-1-1 telephone number.1.5 This guide applies only to the use of the number 9-1-1 to request a public safety response, from the point of initiation of the call through the point that the caller is connected to the responsible agency, or essential information needed for disposition of the call, or both, is received.1.6 The sections in this guide are arranged in the following order: Section 1Terminology 2Significance and Use 3Concept of Operation for 9-1-1 Telephone Systems 49-1-1 Performance Factors 4.19-1-1 Performance Requirements 4.2Coordinating 9-1-1 Systems 5State 9-1-1 Statutory Provisions 69-1-1 Funding 7Funding Alternatives 7.1Funding considerations 7.2Geographical Data Bases 8Automatic Location Identification 8.1Uniform Address Program 8.2Selective Call Routing 8.3Service Areas 8.4Other Planning Concerns 9Public Education 9.1Personnel Training 9.21.7 This standard does not purport to address all of the safety problems, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

定价: 0元 / 折扣价: 0

在线阅读 收 藏

4.1 This practice addresses AML PAs, PUs, Keyword Features, and Project Sites. This practice is significant as it provides for uniformity of geospatial data pertaining to the geographic location and description of AML sites located throughout the United States.4.2 This geospatial data standard will help ensure uniformity of data contributed by each RA and assist organizations in efforts to create, utilize, and share geospatial data. Use of this standard will result in organized and accessible data to support programmatic decisions and work plan development, increased awareness of AML problems, and better communication between RA, the public, industry, and other interested parties.4.3 The geospatial data may be served as a layer in a national dataset and map service.1.1 This practice covers the minimum elements for the accurate location and description of geospatial data for defining Abandoned Mine Land (AML) Problem Areas, Planning Units, Keyword Features, and Project Sites as originally defined by the Office of Surface Mining Reclamation and Enforcement (OSMRE), through its Abandoned Mine Land Inventory Manual (Directive AML-1) under the jurisdiction of Surface Mining Control and Reclamation Act of 1977. These standards remain applicable to mining organizations that geospatially locate and identify AML sites, however these standards can be used for entities that are in beginning phases of mapping and identifying AML sites using protocol that is consistent with existing nomenclature.1.1.1 Abandoned mine lands consist of those lands and waters which were mined for coal or other minerals, or both, and abandoned or left in an inadequate condition of reclamation and for which there is no continuing reclamation responsibility for mitigation of adverse impacts to human health and safety or environmental resources.1.1.2 As used in this practice, an AML Problem Area (PA) represents a closed polygon boundary for a uniquely defined geographic area contained within an AML Planning Unit (PU). An AML PA is a subdivision of an AML PU that contains one or more AML keyword features together with impacted land or water resources or both. An AML PA should not cross PU boundaries.1.1.3 As used in this practice, an AML PU represents a closed polygon boundary of a uniquely defined geographic area identified by unique numbers and names. An entire WCU may be delineated as a single PU or subdivided into multiple PUs.1.1.4 As used in this practice, an AML Keyword Feature is a point, line, or polygon defining the location of a specific on-the-ground feature contained within an AML Problem Area (PA) as described in the AML Inventory Manual.1.1.5 As used in this practice, an AML Project Site is a closed polygon boundary for a uniquely defined geographic area that includes the area disturbed to achieve the reclamation. An AML Project Site may contain one or more AML keyword features together with impacted land or water resources or both.1.2 Units—The values stated in either SI units or inch-pound units are to be regarded separately as standard. The values stated in each system may not be exact equivalents; therefore, each system shall be used independently of the other. Combining values from the two systems may result in non-conformance with the standard.1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use.1.4 This practice offers a set of instructions for performing one or more specific operations. This document cannot replace education or experience and should be used in conjunction with professional judgment. Not all aspects of this practice may be applicable in all circumstances. This ASTM standard is not intended to represent or replace the standard of care by which the adequacy of a given professional service must be judged, nor should this document be applied without consideration of a project’s many unique aspects. The word “Standard” in the title of this document means only that the document has been approved through the ASTM consensus process.1.5 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.

定价: 702元 / 折扣价: 597 加购物车

在线阅读 收 藏

4.1 The user of this guide is not assumed to be a technical practitioner in the water field. This guide is an assembly of the components common to all aspects of water monitoring and fulfills a need in the development of a common framework for a better coordinated and more unified approach to monitoring water.4.2 Limitations—This guide does not establish a standard procedure to follow in all cases and it does not cover the details necessary to meet a particular monitoring objective.1.1 Purpose—This guide is generic in its application to surface or ground water, rivers, lakes, or estuaries (quantity and quality). It proposes a series of options that offer direction without recommending a definite course of action and discusses the major elements that are common to all purposes of water monitoring.1.2 The elements described are applicable whether the monitoring is only for one location or integrates multiple measurement sites for the purpose of assessing a whole watershed, estuary, or aquifer system.1.3 This guide is intended to outline for planners and administrators the components, process, and procedures which should be considered when proposing, planning, or implementing a monitoring program. The guide is not a substitute for obtaining specific technical advice. The reader is not assumed to be a technical practitioner in the water field; however, practitioners will find it a good summary of practice and a handy checklist. Other standard guides have or will be prepared that address the necessary detail.1.4 Monitoring Components—A water monitoring program is composed of a set of activities, practices, and procedures designed to collect reliable information of known accuracy and precision concerning a particular water resource in order to achieve a specific goal or purpose. The purposes may range in scope from tracking status and trends on a regional or national basis to gathering data to determine the effects of a specific management practice or pollution incident such as a spill. This guide suggests and discusses the following process and components:1.4.1 Establishment of program goals and objectives and recording of decisions in a written plan (see 6.1),1.4.2 Developing background data and a conceptual model (see 6.1.12),1.4.3 Establishment of data (quality, quantity, type) objectives (see 6.2),1.4.4 Design of field measurement and sampling strategies and specification of laboratory analyses and data acceptance criteria (see 6.3),1.4.5 Data storage and transfer (see 6.6),1.4.6 Implementation of sampling and analysis strategies (see 6.4),1.4.7 Data quality assessment (see 6.5),1.4.8 Assessment of data (see 6.7),1.4.9 Program evaluation (see 6.8), and1.4.10 Reporting (see 6.9). See also Fig. X1.1 in Appendix X1 and the condensed list of headings in Appendix X2.1.5 Monitoring Purposes—Establishing goals defines the purpose for monitoring. Each purpose has some monitoring design needs specific to itself. There are six major purposes for water monitoring. They are as follows:1.5.1 Determining the Status and Trends of Water Conditions—This can require long term, regular monitoring to determine how parameters change over time.1.5.2 Detecting Existing and Emerging Problems—Determining if, how, or where a substance may move through an aquatic system, or if water quantities are changing.1.5.3 Developing and Implementing Management and Regulatory Programs—Includes baseline and reconnaissance monitoring to characterize existing conditions such as to identify critical areas or hot spots; implementation monitoring to assess whether activities were carried out as planned; and compliance monitoring to determine if specific water quality or water use criteria were met.1.5.4 Responding to an Emergency—Performed to provide information in the near term.1.5.5 Evaluating the Effectiveness of Water Monitoring Programs—Is the monitoring able to achieve the stated goals? Also, monitoring to check on monitoring.1.5.6 Supporting research objectives or validating of simulation models.1.6 This guide is applicable to these purposes and provides guidance on some of the specific needs of each. After goals and objectives have been established, a specialist can define the type, frequency, and duration of sampling and measurements. The specialist also will be able to forecast the data analysis needed to meet the objectives.1.7 There are related standards currently available or under development and several documents that prescribe protocols for water monitoring (4-9). See also Section 2.1.8 This guide suggests that water monitoring programs use standardized documented protocols for all aspects of the program. Where they are not available or appropriate, the methods used should be documented.1.9 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use.1.10 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.

定价: 646元 / 折扣价: 550 加购物车

在线阅读 收 藏

5.1 Environmental data are often required for making regulatory and programmatic decisions. These data must be of known quality commensurate with their intended use.5.2 Certain minimal criteria must be met by the field organizations in order to meet the objectives of the water monitoring activities.5.3 This guide defines the criteria for organizations taking water samples and generating environmental data and identifies other activities that may be required based on the DQOs.5.4 This guide emphasizes the importance of communication among those involved in establishing the DQOs, planning, and implementing the sampling and analysis aspects of environmental data generation activities, and assessing data quality.1.1 This guide covers planning and implementation of the sampling aspects of environmental data generation activities. Environmental data generation efforts are comprised of four parts: (1) establishment of data quality objectives (DQOs); (2) design of field sampling and measurement strategies and specification of laboratory analyses and data acceptance criteria; (3) implementation of sampling and analysis strategies; and (4) data quality assessment.1.2 This guide defines the criteria that must be considered to ensure the quality of the field aspects of environmental data and sample generation activities.1.3 DQOs should be adopted prior to the application of this guide. The data generated in accordance with this guide are subject to a final assessment to determine whether the DQOs were met. For example, many screening activities do not require all of the quality assurance (QA) and quality control (QC) steps found in this guide to generate data adequate to meet the project needs. The extent to which all of the requirements must be met remains a matter of technical judgement as it relates to the established DQOs.1.4 This guide presents extensive management requirements designed to ensure high-quality samples and data. The words “must,” “shall,” “may,” and “should” have been selected carefully to reflect the importance placed on many of the statements made in this guide.1.5 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use.1.6 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.

定价: 590元 / 折扣价: 502 加购物车

在线阅读 收 藏

3.1 The success of a sampling event is influenced by adequate planning and preparation. Use of this guide will help the groundwater sampler to methodically execute the planning and preparation.3.2 This guide should be used by a professional or technician that has training or experience in groundwater sampling.1.1 This guide covers planning and preparing for a groundwater sampling event. It includes technical and administrative considerations and procedures. Example checklists are also provided as Appendices.1.2 This guide may not cover every consideration procedure, or both, that is necessary before all groundwater sampling projects. In karst or fractured rock terranes, it may be appropriate to collect groundwater samples from springs (see Guide D5717). This guide focuses on sampling of groundwater from monitoring wells; however, most of the guidance herein can apply to the sampling of springs as well.1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use.1.4 This guide offers an organized collection of information or a series of options and does not recommend a specific course of action. This document cannot replace education or experience and should be used in conjunction with professional judgment. Not all aspects of this guide may be applicable in all circumstances. This ASTM standard is not intended to represent or replace the standard of care by which the adequacy of a given professional service must be judged, nor should this document be applied without consideration of a project's many unique aspects. The word “Standard” in the title of this document means only that the document has been approved through the ASTM consensus process.1.5 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.

定价: 590元 / 折扣价: 502 加购物车

在线阅读 收 藏

5.1 This guide is intended for use by communities, which may include towns, incorporated cities, counties, or similar entities with the authority to convene and implement resilience planning. The process described in this guide may have applications to a broader set of users, such as those described in Guide E3032.5.2 This guide is intended to be applied at a community or regional geographical and administrative scale. Smaller geographic and administrative scales, such as neighborhood scales, may also use this guide; however, there may be limitations in the range of solutions (see Step 4B) that are available due to statutory, regulatory, financial, or administrative constraints caused by limitations in governance bodies.5.3 This guide provides an analytical framework for establishing desired versus current anticipated performance in terms of time to recovery of function for clusters and infrastructure systems. The output of this analytical framework provides an objective basis for establishing priorities among proposed strategies and solutions to help meet community resilience goals.5.4 The planning and analytical process can be applied to any hazard, though the focus is on natural hazards. Steps 1 and 2 (form a collaborative planning team and understand the situation) do not require the use of hazard information and provide useful information for communities that can be incorporated into a resilience plan. The activities described in Steps 3 and 4 (determine goals and objectives, and develop the plan) require technical information about hazards and an assessment of their impact on community systems.5.5 This guide provides a planning process that emphasizes disaster recovery outcomes. However, all phases of preparedness, including prevention, protection, mitigation, response, and recovery, are important to the successful achievement of disaster recovery objectives. The analytical outputs of this guide should inform all phases of preparedness and provide an objective approach to prioritize pre-event mitigation action.5.6 The steps of this guide, presented in Section 6, are best initiated in the order provided. However, with the exception of the formation of a collaborative planning team in Step 1 and implementation and reporting Steps 5 and 6, it is feasible to complete Steps 2 to 4 in a non-consecutive order. Depending on a community’s specific needs, timeline, resources, or technical capabilities, Steps 2 to 4 may occur in a different order than described in this guide. In Section 6, supplemental information that elaborates on how to implement each step and collaborative planning team flexibilities is provided in a discussion note following each step.NOTE 1: The collaborative planning team provides the foundation for stakeholder engagement and input in subsequent steps, even if later steps are completed in a different order than what is described in this guide. Ideally, each step should be at least initiated to describe how the plan will eventually address all elements of resilience planning.5.7  Resilience plans developed with the support of this guide should be compatible with, inform, and augment other hazard mitigation planning and comprehensive planning processes. It is compatible with the National Preparedness Goal, the National Infrastructure Protection Plan, and the National Disaster Recovery Framework, and should inform and be consistent with other state and local plans and priorities. In practice, this includes general plans, capital improvement programs, hazard mitigation, emergency response, recovery, economic development, and transportation plans.1.1 This guide sets forth a flexible approach for communities to develop customized, comprehensive resilience plans for buildings and infrastructure systems that include input from relevant stakeholders; consider the social, economic, and physical systems of a community; establish community-scale performance goals that encourage recovery-oriented planning; and recommend processes to implement and maintain community resilience plans over time as community priorities evolve and change.1.1.1 The social dimensions of a community should drive the requirements of a community’s resilience plans and the performance of its physical systems, especially during recovery. The identification of social functions is a fundamental element of developing community resilience plans that accurately reflect priorities for recovery after a hazard event.1.2 The guide process steps address how to (1) form collaborative planning teams; (2) evaluate the current condition of social and built dimensions of a community; (3) determine community goals and objectives for built systems and hazards; (4) develop plans that address performance gaps and identify solutions; (5) prepare, review and approve final community resilience plans; and (6) implement and maintain resilience plans.1.3 This guide provides a process that facilitates priority setting and decision making regarding the establishment of community resilience goals and associated solutions. The process provides a framework for community resilience planning needs and is not intended to be prescriptive.1.4 Limitations of Guide—This guide does not advocate or specify any particular analytical methodology for ascertaining the performance of the built environment. This guide also does not directly address the effects of climate change, although the planning process can incorporate such events and impacts. (For additional information on these processes to address climate resilience planning, refer to Guide E3032.) This guide addresses buildings and infrastructure systems and how they support the social dimensions of communities, and considers how the elements of the built environment support social and economic community functions. The application of this guide is intended to support community resilience planning efforts across a community’s interdependent building and infrastructure systems. Applications beyond this scope were not considered in the development of this guide.1.5 Units—The values stated in SI units are to be regarded as the standard. No other units of measurement are included in this standard.1.6 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety, health, and environmental practices and determine the applicability of regulatory limitations prior to use.1.7 This international standard was developed in accordance with internationally recognized principles on standardization established in the Decision on Principles for the Development of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.

定价: 843元 / 折扣价: 717 加购物车

在线阅读 收 藏

This guide is intended to assist the management of the local EMS agencies or organizations in the design, planning, and response of their jurisdiction's resources to multiple casualty incidents (MCIs). This guide does not address all of the necessary planning and response of pre-hospital care agencies to an incident that involves the total destruction of community services and systems. This guide does not address the necessary design, planning, and response to be undertaken by a medical care facility to an internal or external event that necessitates the activation of the facility's disaster plan. This guide provides procedures to coordinate and provide a systematic and standardized response by responsible parties, including the local elected officials, emergency management officials, public safety officials, medical care officials (pre-hospital and hospital), local EMS agencies/organizations and others with objectives and tasks for the pre-hospital management of a significant incident. This guide provides for the establishment of an incident command system with position descriptions that identify mission, functions, and responsibilities of the command structure to be used at a MCI. The incident command functions include but are not limited to staging, logistics, rescue/extrication, triage, treatment, transportation (air, land, and water), communications, and fatality management. This guide provides examples and other management tools that can assist in providing training objectives and decision making models for dispatch, response, triage, treatment, and transportation for local jurisdictions experiencing multiple casualty incidents. PLANNING Top 1.1 This guide covers the planning, needs assessment, training, integration, coordination, mutual aid, implementation, provision of resources, and evaluation of the response of a local emergency medical service (EMS) organization or agency to a multiple patient producing situation that may or may not involve property loss. This guide is limited to the pre-hospital response and mitigation of an incident up to and including the disposition of patients from the incident scene. 1.2 This guide addresses the background on planning, scope, structure, application, federal, state, local, voluntary, and nongovernmental resources and planning efforts involved in developing, implementing, and evaluating an EMS annex, or component, to the local jurisdiction's emergency operations plan (EOP) as defined in the Federal Emergency Management Agency (FEMA) publication, Civil Preparedness Guide (CPG) 1–8. 1.3 This standard does not purport to address the safety concerns associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

定价: 0元 / 折扣价: 0

在线阅读 收 藏

This practice addresses an AMLIS PU and its geospatial data relative to the Surface Mining Control and Reclamation Act of 1977 (SMCRA). In general, PUs east of the Mississippi River have historically corresponded to watersheds; PUs west of the Mississippi River have been defined in a number of ways, including quadrangles, grazing districts, townships, counties, or entire WCU. This practice is significant to communities impacted by abandoned mines because it provides for uniformity of geospatial data pertaining to the geographic location and description of AML PUs located throughout the United States. These standards will help ensure uniformity of data contributed by each RA and assist organizations in future efforts to create and utilize geospatial data relative to the reclamation of land and the remediation of watersheds located within the AML PUs across the United States.Qualitative and quantitative AMLIS PU descriptions shall be obtained from state and federal regulatory authorities. Use of this standard will help create consistent maps and increase the awareness of the AML PUs throughout the United States and the status of the current reclamation that occurs within each PU over time. This standard creates well organized and easily accessible AML PU data and relational attributes, and it will lead to better communication between RA and federal offices, the public, industry and environmental groups.As used in this practice, the geospatial data represents an area where coal removal occurred prior to SMCRA and these unreclaimed mining features continue to be present within a defined AMLIS PU, defined as a polygon feature. This practice creates an easier and more efficient way to utilize and share AML PU geospatial data between RAs and communities impacted by abandoned mines.The data set may be served as a layer in The National Map, an online, interactive map service sponsored by a consortium of US federal, state, and local partners and hosted by the U.S. Geological Survey (USGS). The National Map provides a consistent framework for high-quality, geospatial data and information from multiple partners to enhance America's ability to access, integrate, and apply current, accurate, and nationally consistent digital data at global, national, and local scales.This standard conforms to the definition of a Data Content Standard as promulgated by the U.S. Federal Geographic Data Committee (FGDC). Terminology and definitions for identifying geographical features and describing the data model has been adopted from the FGDC Spatial Data Transfer Standard (ANSI INCITS 320-1998 (R2003)) and the FGDC Framework Data Content Standard (FGDC Project 1574-D) Information Technology – Part 5 Governmental unit and other geographic area boundaries.1.1 This practice covers the minimum elements for the accurate description of geospatial data for defining an Abandoned Mine Land Inventory System (AMLIS) Planning Unit (PU).1.1.1 This practice addresses mining geospatial data relative to the Surface Mining Control and Reclamation Act of 1977 (SMCRA). This geospatial data shall be obtained from each state, tribal, or federal (or combinations thereof) coal mining regulatory authority (RA) authorized under SMCRA to reclaim the surface and underground effects of past mining operations. Abandoned mine land (AML), as specified in SMCRA Sections 404 (coal), 409 and 411 (non-coal) and cross referenced in additional sections on eligible lands, consists of those lands and waters which were mined for coal or other minerals (or both), or impacted by processing operations prior to enactment of the SMCRA and abandoned or left in an inadequate state of reclamation and for which there is no continuing reclamation responsibility under state or other federal laws for mitigation of adverse impacts to human health and safety or environmental resources.1.1.2 Title IV of the SMCRA establishes the national AML Reclamation Program under the Office of Surface Mining Reclamation and Enforcement (OSMRE), U.S. Department of the Interior. The program was developed to reclaim land and water resources adversely affected by past coal mining and left abandoned or inadequately restored. During the years immediately following enactment of the SMCRA, OSMRE, states, and Native American tribes conducted surveys of eligible lands and waters and created individual inventories of problems to be addressed under Title IV. In 1990 SMCRA was amended and OSMRE was required to maintain a national inventory of high priority abandoned coal sites and provide standardized procedures for states and tribes to use in updating the data. The need for an automated nationwide inventory led to the creation of the national AMLIS, a compilation of the individual state, tribe, Federal Reclamation Program (FRP), and Rural Abandoned Mine Program (RAMP) inventories. The AMLIS documents the estimated unfunded costs to remedy AML problems, records when funding is made available for a problem area, and captures costs for completed constructed projects. It is used to record the work completed under each individual AML program and report the extent and cost of AML problems remaining.1.1.3 Each state has been divided into Water Cataloging Units (WCU) by the U.S. Water Resources Council. These appear in the state’s Hydrologic Unit Map prepared by the U.S. Department of the Interior, U.S. Geological Survey, in cooperation with the Water Resources Council. The WCU are divided and sub-divided into successively smaller hydrologic units, which are classified into four levels: regions, sub-regions, accounting units, and cataloging units. The hydrologic units are arranged within each other, from the smallest (cataloging units) to the largest (regions). Each hydrologic unit is identified by a unique Hydrologic Unit Code (HUC) consisting of two to eight digits based on the four levels of classification in the hydrologic unit system.1.1.4 As used in this practice, an AML PU represents a closed polygon that defines the boundary of a uniquely defined geographic area contained within a WCU. The entire WCU may be delineated as a single PU or subdivided into multiple PUs. In general, PUs east of the Mississippi River have historically corresponded to watersheds; PUs west of the Mississippi River have been defined in a number of ways, including quadrangles, grazing districts, townships, counties, or entire WCU.1.2 This practice applies to pre-SMCRA AML PUs that may contain problem areas and prioritized problem types that are inventoried in the AMLIS under the SMCRA Title IV Reauthorization to provide for identification and management of AML sites and reclamation operations and facilitate the sharing of information with the public.1.3 The values stated in either SI units or inch-pound units are to be regarded separately as standard. The values stated in each system may not be exact equivalents; therefore, each system shall be used independently of the other. Combining values from the two systems may result in non-conformance with the standard.1.4 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.1.5 This practice offers a set of instructions for performing one or more specific operations. This document cannot replace education or experience and should be used in conjunction with professional judgment. Not all aspects of this practice may be applicable in all circumstances. This ASTM standard is not intended to represent or replace the standard of care by which the adequacy of a given professional service must be judged, nor should this document be applied without consideration of a project’s many unique aspects. The word “Standard” in the title of this document means only that the document has been approved through the ASTM consensus process.

定价: 0元 / 折扣价: 0

在线阅读 收 藏
23 条记录,每页 15 条,当前第 2 / 2 页 第一页 | 上一页 | 下一页 | 最末页  |     转到第   页